Friday 17 August 2012

Well....havent updated the blog for 2 days, because I've been rather busy :) I'll comment on the pics one at a time. Day 5,6,7.
This pic shows how I had to make a space between some bricks to run the water lines across the passage to feed the shower, basin and toilet. The next pic will be the completed job. I kept the one pipe without any fittings...to avoid more risk of leaks. I used a T-Piece on the cold water pipe which was unavoidable.
The pic below shows where the pipes pop up out the floor..ready to receive T-Pieces..to supply the shower..and contine to basin..and toilet.

No comments:

Post a Comment

UK Waterways Ranking